About the Landscape Juice Network

Founded in 2008. The Landscape Juice Network (LJN) is the largest and fastest growing professional landscaping and horticultural association in the United Kingdom.

LJN's professional business forum is unrivalled and open to anyone within within the UK landscape industry

LJN's Business Objectives Group (BOG) is for any Pro serious about building their business.

For the researching visitor there's a wealth of landscaping ideas, garden design ideas, lawn advice tips and advice about garden maintenance.

Lone Working Risk Assessment

Hi All,

This is my first posting. I would like some help. I am applying for a grass contract with the Forestry Commision and i need a Lone Working Risk Assessment. If you have a copy or give me some advice, this would be great.

Thanks

Jamie

You need to be a member of Landscape Juice Network to add comments!

Join Landscape Juice Network

Votes: 0
Email me when people reply –

Replies

  • PRO
    Jamie, first go get indg63 & indg73 booklets from hse website. They give you all the basics. Ours are based on those publications (which are foc). Next go to businesslink.gov.uk and search out their lone worker briefing section. I remember it is helpful.

    Sorry, it's sad I know, but I know those publications by heart ;-)
  • PRO

    heres the link to the HSE lone working criteria http://www.hse.gov.uk/contact/faqs/workalone.htm

  • Jamie,

    As Gary has suggested.

    However here is a really old Lone Working Risk doc that I had lying around.   I have a more updated version in the office but hopefully this will give you an idea as to the type of things you need to consider.

    In my example, I do not permit ladder work to be done by a lone worker, however as we all know for sole traders this isn't always an option!  - You will need to assess each risk for the particular task being performed, in your case grass cutting and make the necessary changes.

    RISK ASSESSMENT - GENERAL – LONE WORKING

     

    Prior to work commencement

    1. Must have PPE overalls, safety footwear etc.

    2. Consider risks and hazards associated with the task to carry out. Refer any concerns to the supervisor before commencing work.

    3. Take into account any generic risk assessments associated with the work in hand.

     

    Hazards

    1. Violence.

    2. Falls from heights.

    3. Manual handling.

    4. Lack of communication.

     

    Control Measures

    1. Mobile telephone must be switched on and operational at all times during the working day.

    2. Only experienced and trained personnel with no adverse medical history will be considered for working alone.

    3. Where it is necessary to work alone, ensure, wherever possible, that someone in the vicinity of the works knows that you are alone and the approximate time that you are expected to complete the job.

    4. Where working in unoccupied buildings / grounds, contact should be made at pre-arranged intervals with persons specified by the supervisor or the supervisor.

    General Note

    Certain jobs will always be carried out with the assistance of at least one other person. These would include:

    1. Working on ladders or scaffolding

    2. Work in confined spaces

    3. Chain Saw work

  • Thank you for your comments. I have now done the risk assessment.
This reply was deleted.

Trade green waste centres

<!-- Google tag (gtag.js) --> <script async src="https://www.googletagmanager.com/gtag/js?id=G-WQ68WVXQ8K"></script> <script> window.dataLayer = window.dataLayer || []; function gtag(){dataLayer.push(arguments);} gtag('js', new Date()); gtag('config', 'G-WQ68WVXQ8K'); </script>

LJN Sponsor

Advertising