THIS PROJECT IS UNDER CONSTRUCTION, CLICK HERE TO VIEW DAYS 11 - 14 IMAGES.

Day 15

  Black sleepers removed

The client has requested that the curved rising black sleeper shrine at ground level be raised by 1 meter so the garden structure is visible from the higher seating area.

A work change order form has been filed and signed by the client to authorise the change, this is quoted for and accepted, we are happy to alter our designs at any stage if you are happy to pay for the additional materials and labour.

The higher level seating area has been marked out for the paving.

  Paving marked out

The sleepers are jack hammered out of the concrete and stored for later use. The ducting for the base of the sleepers is adjusted.

New footings have been cut and concreted and the additional nine inch block work installed to the correct height. Weep holes have been extended.

Render continues to be laid on the walls, all render mixes have the rapid cement hardener included.

  Shrine area extended

Day 16

Bespoke trellis

 

The build to the new raised shrine area has been beaded, scratch coated and rendered.

The sub base to the lower footpath has been installed to the correct falls and levels.

The sub base to higher artificial lawn has been installed to the correct level.

All render works has been completed.

Works begin on the bespoke trellis to screen the sheds from the house, the trellis will be painted black.

Weed supressing membrane

All the top soil to the planters has been leveled to 80mm below finish level.

A weed suppressing membrane has been cut and pinned in place over the top soil in the planters, the base of the perimeter fence has been touched in with black paint due to splash back from the rain.

A second coat of black paint is being applied to the bespoke trellis works.

Day 17

Tobermore Sienna graphite

Every 150 x 150mm pitch to the trellis work has a 40mm screw inserted to the center and works continue with applying the paint.

All the Tobermore Sienna Graphite block paving is brought by barrows from the front driveway landing point to the rear of the garden and loaded out in the two separate sizes.

I ensure that the Tobermore blocks are covered with polythene as the skin on the hands will wear down quickly if the blocks are wet, causing what known as birds eyes.

Four passes of a compactor plate consolidates the sub base, 40mm of 50/50 course sand is barrowed into place, raked and leveled and the wacker plate is passed over three times.

Tobermore block paving foothpath

The center line to the paved area is sprayed at each end and a road pin and string line used to ensure the correct falls and levels are in place.

Knowing the sizes and quantities of the block paving stepping stones, calculations are made to ensure even spacing's between each pad, in this case 370mm.

The block paving is installed on the screed ed sand making sure there are no running joints.

Kiln dried sand will be installed at a later date to tighten the blocks.

Tobermore concrete products



A perimeter of concrete is applied to each stepping stone and haunch ed to a level of 25mm below the finished surface level, this concrete will secure the blocks in place.

Each block paved stepping pad is scrubbed with a still brush and cold water, this cleans all the off and is now ready for the jointing sand.

Clean light weight general purpose polythene covers the entire area to allow the concrete to go off with out the rain washing it all away by the morning.

THIS PROJECT IS ON GOING, PLEASE CLICK HERE TO VIEW FURTHER PROGRESS.

★
★
★
★
★
Votes: 0
E-mail me when people leave their comments –

You need to be a member of Landscape Juice Network to add comments!

Join Landscape Juice Network

Open forum activity

Piers Dixon replied to Piers Dixon's discussion Advertising garden maintenance services
"Thanks for your response. Have you actually tried this??"
21 hours ago
trimmora updated their profile
21 hours ago
Fusion Media posted a blog post
After 26 years at Radley College, Adam King has seen grounds management evolve dramatically. Weather patterns have become less predictable, playing surfaces are under greater pressure than ever, and flexibility has become one of the most valuable…
yesterday
Fusion Media posted a blog post
GroundsFest has welcomed Christina Walker to its sales team as preparations continue for the 2027 exhibition.Christina joins the award-winning team with an extensive background in publishing and exhibitions spanning more than two decades. She began…
yesterday
Fusion Media posted a blog post
When freezing temperatures threaten the pitches at Forest Green Rovers FC, speed is everything. Protecting the stadium and training ground with frost covers can be a race against the weather, but thanks to Kress battery-powered blowers, the club's…
Thursday
Fusion Media posted a blog post
The GroundsFest Academy has confirmed TLS as its newest Platinum Sponsor, adding further industry strength to the Academy's range of sponsors and partners as it continues to expand its training offering for the groundscare sector. The sponsorship…
Thursday
Peter sellers replied to William Baker's discussion Winter Services
"Hi William, I would avoid working as a sub contractor if you can. Yes they will not pay a realistic rate as they will try to keep their profit as high as poss, in my experience getting paid was always an issue. We had a long and profitable…"
Wednesday
Billybop replied to William Baker's discussion Winter Services
"Thanks William, yes a bit like being a retained fire fighter I suppose. Monthly payments for a 12 month contract, knowing that worst case scenario only 6 months or so might require visits. Which could be very few and far between, or more numerous…"
Wednesday
William Baker replied to William Baker's discussion Winter Services
"Hi Richard, thank you for your reply. I've not approached either of these companies as yet, would you suggest Outco and Nurture are good companies to contact, and do you have any experience with either?"
Tuesday
William Baker replied to William Baker's discussion Winter Services
"Hi Peter, thank you very much for such a detailed response, and I'm sorry to hear of your ill health, I do hope you are well. Both of my existing clients that I'm looking to bring on board should be manageable, so they can hopefully help me to dip…"
Tuesday
William Baker replied to William Baker's discussion Winter Services
"Hi Billy, that's a really good idea, even if the contracts are a mix of 'subsciption' and ad-hoc, it at least covers the expense in a worst case scenario. "
Tuesday
Billybop replied to Rob's discussion Best professional battery hedge trimmer at present?
"Hi Tim i wear basic disposable ear plugs with either model if using for any extended period... not so much the volume per se, but it takes the edge off that irritating metallic sound... I think these are being sold for below cost, but heart warming…"
Tuesday
Tim Wallach replied to Rob's discussion Best professional battery hedge trimmer at present?
"My 130T arrived and was tested today.   It certainly runs fast...the high motor noise is slightly irritating compared to the rumble of the 130R though.  I've got used to working without ear defenders.    Planet tool owe you a finders fee."
Tuesday
Matt updated their profile
Nov 1
Matt posted a discussion
Morning all,I’m Matt from That Pond Guy, a specialist pond maintenance company based in Burham, Kent. I’ve just joined LJN and thought I’d introduce myself.We cover Kent, London and the wider South East, looking after everything from garden wildlife…
Nov 1
Matt is now a member of Landscape Juice Network
Nov 1
More…